Sheet 02
Welding and certification
TIG and MIG in three bays, with coded welders and weld procedures where the job calls for them.
- Material
- TIG · MIG
- Capacity
- AS/NZS 1554 GP
- Issued by
- Ardmore Metalworks
The process
What we hold to on this.
Three bays, TIG and MIG, with coded welders and written weld procedures where the job calls for them. Structural work is welded to AS/NZS 1554 GP and the paperwork goes out with the job rather than a fortnight after it.
Stainless is welded in its own bay and purged, so nothing that goes into a kitchen has picked up carbon from mild steel on the way through the shop.
How it runs
Drawing to quote to first-off inspection.
- 01
Send the drawing
DXF or PDF. If it needs redrawing for nesting we will redraw it and send it back for you to check.
Same day
- 02
Quote off the nested sheet
Priced from the actual nest, not an estimate per part.
2 working days
- 03
First-off inspection
First part gets checked against the drawing before the run continues.
- Address
- 6B Kelvin Road, Papakura, Auckland 2110
- Hours
- Monday to Thursday6.30am – 4.30pmFriday6.30am – 2pm
- Delivering to
- Auckland, Waikato, Bay of Plenty